Nova C seating from Green Furniture Concept at London Waterloo railway station
  • Customer Network Rail
  • Architect Green Furniture Concept
  • Year 2020-2022
  • Location London, UK
Our customers have given us really valuable and positive feedback on the increase in seating.
Yasmin Mellar, Project Manager - Change, Network Rail

The project for Waterloo Station was done in two stages. In the first stage, 2020, we installed a warm wood colour mix of Nova C benches that fit perfectly around the station’s columns, making the best use of the space and working with the current architecture of the building. To additionally serve the visitor’s needs, we added tables for work and F&B, many of which include wireless charging.

In March 2022, we installed an additional 54 seats and perches across Waterloo station, including a coloured design to add interest and symbolise diversity. Our customers have given us valuable and positive feedback on the increased seating.

500

trees planted thanks to this project

The challenge

Waterloo Station is one of the busiest stations in the country, with a high volume of train services and interaction with tube lines. Passenger feedback demonstrated that our customers felt that there was not enough seating available at Waterloo Station. We must provide a great experience to our passengers whilst they travel through the station, so it was clear that we needed to enhance the offering of seating available at the station.

Nova C seating from Green Furniture Concept at London Waterloo railway station

The Green solution

We Increased the offering of seats available to our customers on the lower concourse and the balcony. Network Rail also saw the opportunity to include seating in diversity and inclusion colours to act as a visual representation of the importance of diversity and inclusion.

For this, we added different seating solutions with contrasting colours and PRM signage that seamlessly fit with the rest of the seating installation to achieve an inclusive place where everyone feels welcome. For those on the go, we added our standing bench, Nova C Perch, perfect for crowded environments and when you want to take a short break.

The result

Nova C seating from Green Furniture Concept at London Waterloo railway station

The Rainbow Bench

The rainbow bench was installed to raise attention with its colourful design and symbolise diversity for the station

Nova C PRM seating from Green Furniture Concept at London Waterloo railway station

Accessibility seating

Accessibility seats with elevation, different colours and signage

Nova C Perch from Green Furniture Concept at London Waterloo railway station

Nova C Perch

Offers a space for people on the go just take a short standing break

Nova C seating from Green Furniture Concept at London Waterloo railway station

Seating for all

Flowing seating offers the opportunity for social interaction and private space if needed

Wireless charger table from Green Furniture Concept at London Waterloo railway station

All-in-one charging

Wireless and regular charging points for devices while waiting

Nova C seating from Green Furniture Concept at London Waterloo railway station

Architectural fitting

Nova C seating fitted around the columns seamlessly work with the building structur

“We have received good passenger feedback through our QR code surveys, and as you walk through the station, it feels that there are more places for our customers to sit.”

– Yasmin Mellar
Project Manager – Change, Network Rail

Products in this project

Modules

Nova C Back 100

Article number: NBA1
Details

Nova C Back 150

Article number: NBA5
Details

Nova C Back Convex 30°

Article number: NBA3_30
Details

Nova C Back Convex 45°

Article number: NBA3_45
Details

Nova C Back Convex 90°

Article number: NBA3_90
Details

Nova C Back Concave 30°

Article number: NBA4_30
Details

Nova C Back Concave 45°

Article number: NBA4_45
Details

Nova C Back Concave 60°

Article number: NBA4_60
Details

Nova C Back Concave 90°

Article number: NBA4_90
Details

Nova C Back S-Curve L

Article number: NBA6_L
Details

Nova C Back S-Curve R

Article number: NBA6_R
Details

Nova C Back Endpiece L

Article number: NBA7_L
Details

Nova C Back Endpiece R

Article number: NBA7_R
Details

Nova C Back Endpiece Corner

Article number: NBA8
Details

Add-ons

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C Food and Beverage Armrest

Article number: NBA_A2
Details

Nova C Table

Article number: NBX_T
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Food and Beverage Armrest w/Charger

Article number: NBA_A3
Details

Nova C Leg Charger

Article number: A01D_x
Details

Nova C Rib Charger

Article number: NBA_RC
Details

Nova C Divider

Article number: A01E_3
Details

Nova C Divider Concave

Article number: A01E_2
Details

Nova C Divider Convex

Article number: A01E_1
Details

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details

Nova C Accessibility Signage Older

Article number: BA00095
Details

Configurations

Nova C Back Straight

Article number: NBAC6
Details

Nova C Back Donut

Article number: NBAC5
Details

Nova C Back Circle

Article number: NBAC1
Details

Nova C Back Bracket Convex

Article number: NBAC14
Details

Nova C Back Bracket Concave

Article number: NBAC2
Details

Nova C Back Omega

Article number: NBAC3
Details

Nova C Back Wiggly

Article number: NBAC7
Details

Nova C Back Tilde

Article number: NBAC9
Details

Nova C Back Ondular

Article number: NBAC8
Details

Nova C Back Infinity

Article number: NBAC4
Details

Nova C Back Stadium

Article number: NBAC10
Details

Nova C Bowtie

Article number: NBAC11
Details

Nova C Crossroad 3 Small

Article number: NBXC3
Details

Nova C Crossroads 4 Medium

Article number: NBXC4
Details

Nova C Crossroad 3 Medium

Article number: NBXC1
Details

Nova C Fidget Small

Article number: NBXC6
Details

Nova C Fidget

Article number: NBXC5
Details

Nova C Eye

Article number: NBAC13
Details

Nova C Droplet

Article number: NBAC12
Details

Modules

Nova C Double Back 100

Article number: NBAD1
Details

Nova C Double Back 150

Article number: NBED5
Details

Nova C Double Back 30°

Article number: NBAD2_30
Details

Nova C Double Back 45°

Article number: NBAD2_45
Details

Nova C Double Back Endpiece

Article number: NBAD7
Details

Add-ons

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C Table

Article number: NBX_T
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Food and Beverage Armrest

Article number: NBA_A2
Details

Nova C Food and Beverage Armrest w/Charger

Article number: NBA_A3
Details

Nova C Leg Charger

Article number: A01D_x
Details

Nova C Double Back Endpiece Cover w/Charger

Article number: NBAD_ECC
Details

Nova C Double B2B Cover

Article number: NBAD_EC2
Details

Nova C Rib Charger

Article number: NBA_RC
Details

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details

Nova C Accessibility Signage Older

Article number: BA00095
Details

Configurations

Nova C Double Back Straight

Article number: NBADC1
Details

Nova C Double Back Wiggly

Article number: NBADC6
Details

Nova C Double Back Tilde

Article number: NBADC5
Details

Nova C Double Back Ondular

Article number: NBADC4
Details

Nova C Double Back Bracket

Article number: NBADC2
Details

Nova C Double Back Omega

Article number: NBADC3
Details

Nova C Crossroads 4 Medium

Article number: NBXC4
Details

Nova C Crossroad 3 Small

Article number: NBXC3
Details

Nova C Crossroad 3 Medium

Article number: NBXC1
Details

Modules

Nova C Back Elevation

Article number: NBAE1
Details

Nova C Back Elevation Concave 30°

Article number: NBAE4_30
Details

Nova C Back Elevation Concave 45°

Article number: NBAE4_45
Details

Nova C Back Elevation Concave 90°

Article number: NBAE4_90
Details

Nova C Back Elevation Convex 30°

Article number: NBAE3_30
Details

Nova C Back Elevation Convex 45°

Article number: NBAE3_45
Details

Nova C Back Elevation Convex 90°

Article number: NBAE3_90
Details

Nova C Back Elevation Step L

Article number: NBAE1_L
Details

Nova C Back Elevation Step R

Article number: NBAE1_R
Details

Nova C Back Elevation Endpiece L

Article number: NBAE7_L
Details

Nova C Back Elevation Endpiece R

Article number: NBAE7_R
Details

Nova C Back Elevation S-curve Left

Article number: NBAE6_L
Details

Nova C Back Elevation S-curve Right

Article number: NBAE6_R
Details

Add-ons

Nova C Food and Beverage Armrest w/Charger

Article number: NBA_A3
Details

Nova C Food and Beverage Armrest

Article number: NBA_A2
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C Table

Article number: NBX_T
Details

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Leg Charger

Article number: A01D_x
Details

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details

Nova C Accessibility Signage Older

Article number: BA00095
Details

Modules

Nova C Bench 100

Article number: NBE1
Details

Nova C Bench 150

Article number: NBE5
Details

Nova C Bench 30°

Article number: NBE2_30
Details

Nova C Bench 45°

Article number: NBE2_45
Details

Nova C Bench 90°

Article number: NBE2_90
Details

Add-ons

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Bench Armrest

Article number: NBE_A
Details

Nova C Table

Article number: NBX_T
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Leg Charger

Article number: A01D_x
Details

Configurations

Nova C Bench Wiggly

Article number: NBEC6
Details

Nova C Bench Ondular

Article number: NBEC9
Details

Nova C Bench Straight

Article number: NBEC8
Details

Nova C Bench Tilde

Article number: NBEC5
Details

Nova C Bench Bracket

Article number: NBEC2
Details

Nova C Bench Donut

Article number: NBEC7
Details

Nova C Bench Circle

Article number: NBEC1
Details

Nova C Bench Omega

Article number: NBEC3
Details

Nova C Bench Stadium

Article number: NBEC10
Details

Nova C Bench Infinity

Article number: NBEC4
Details

Modules

Nova C Perch

Article number: NPE1
Details

Nova C Perch Convex 30°

Article number: NPE3_30
Details

Nova C Perch Convex 45°

Article number: NPE3_45
Details

Nova C Perch Concave 30°

Article number: NPE4_30
Details

Nova C Perch Concave 45°

Article number: NPE4_45
Details

Modules

Nova C Kids Body 30°

Article number: NBEK2
Details

Nova C Kids Head 30°

Article number: NBEK1
Details

Green transport hubs

We design for travelers and commuters, families and individuals, making comfortable environments a part of every journey. Green’s placemaking approach uplifts waiting areas, brings new life to shops and cafes, and creates areas that offer a sense of calm.

Discover more transport hub design
Planning tool and layout planner

Let us design your next transport hub project

Our in-house designers will help you with a free 3D floor-plan rendering.