Leeds Bradford Airport: Enhancing Passenger Experience

Ascent Emporia
  • Customer Leeds Bradford Airport (LBA)
  • Architect Green Furniture Concept
  • Year 2025
  • Location Yeadon, England, United Kingdom
The new seating not only complements our architectural vision but also enhances both passenger comfort and commercial space. Together with Green Furniture Concept, we created a terminal environment that’s as efficient as it is welcoming.
Chris Wilkinson, Head of Customer Operations

Leeds Bradford Airport (LBA) is undergoing a major transformation as part of its significant terminal expansion plan, aimed at improving comfort, efficiency, and flow for passengers. Green Furniture Concept was selected to contribute to this new terminal by delivering modular and durable seating solutions that support the airport’s long-term vision for environmental responsibility and elevated passenger experiences.

219

trees planted thanks to this project

The Challenge

With more and more people travelling each year, the demand for more efficient and aesthetically pleasing terminal spaces is growing. As a result, LBA needed to create more comfortable and inviting waiting areas without compromising on sustainability or design. The airport sought a solution that would offer high seating capacity, flexible configuration, and visual harmony with the terminal’s contemporary design.

Emporia Ascent

The Solution

We explored ideas that would combine functionality with a sense of place. The result was a seating arrangement centered around three open plazas; spaces designed to offer moments of connection and calm, while remaining visually open and accessible. The configuration encourages both social interaction and privacy, depending on the needs of each traveler. In parallel, biophilic design-inspired seating was installed to guide pedestrian traffic in a natural way while offering inviting places to take a break along the way.

To promote comfort and flexibility, the Ascent and Nova C seating series were selected. Crafted from natural wood, these timeless pieces contribute to a calming atmosphere and foster a tactile connection that enhances overall well-being. In addition, they offer a large seating capacity and a modular approach that can be adapted to the evolving needs of the space. To add another biophilic element, planters were integrated into the Nova C configurations, adding warmth and contributing to a more calming atmosphere.

The Result

The installation has played an important role in elevating both the passenger experience and terminal functionality. Despite a 76% increase in retail area, seating capacity has been expanded by an impressive 83%, ensuring greater comfort while increasing commercial space.

Early feedback from travellers has been positive, with the new seating areas reinforcing LBA’s commitment to passenger well-being and efficiency of the terminal area.

Conclusion

The collaboration between Leeds Bradford Airport and Green Furniture Concept showcases how intentionally designed, durable furniture can elevate both aesthetics and functionality in modern travel spaces. As airports continue to evolve into destinations in themselves, Green Furniture Concept is proud to support this shift with designs that invite, relax, and connect.

Products in this project

Modules

Ascent Emporia

Nova C Double Back 100

Article number: NBAD1
Details
Ascent Emporia

Nova C Double Back 150

Article number: NBED5
Details
Ascent Emporia

Nova C Double Back 30°

Article number: NBAD2_30
Details
Ascent Emporia

Nova C Double Back 45°

Article number: NBAD2_45
Details
Ascent Emporia

Nova C Double Back Endpiece

Article number: NBAD7
Details

Add-ons

Ascent Emporia

Nova C Wireless Table

Article number: NBX_TW
Details
Ascent Emporia

Nova C Back Armrest

Article number: NBA_A
Details
Ascent Emporia

Nova C Table

Article number: NBX_T
Details
Ascent Emporia

Nova C Stone Table Top Eter

Article number: BA00321
Details
Ascent Emporia

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details
Ascent Emporia

Nova C Food & Beverage Armrest

Article number: NBA_A2
Details
Ascent Emporia

Nova C Food & Beverage Armrest w/Charger

Article number: NBA_A3
Details
Ascent Emporia

Nova C Leg Charger

Article number: A01D_x
Details
Ascent Emporia

Nova C Logo on Rib

Article number: NBA_RL
Details
Ascent Emporia

Nova C Double Back Endpiece Cover w/Charger

Article number: NBAD_ECC
Details
Ascent Emporia

Nova C Double B2B Cover

Article number: NBAD_EC2
Details
Ascent Emporia

Nova C Rib Charger

Article number: NBA_RC
Details
Ascent Emporia

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details
Ascent Emporia

Nova C Accessibility Signage Older

Article number: BA00095
Details

Configurations

Ascent Emporia

Nova C Double Back Straight

Article number: NBADC1
Details
Ascent Emporia

Nova C Double Back Wiggly

Article number: NBADC6
Details
Ascent Emporia

Nova C Double Back Tilde

Article number: NBADC5
Details
Ascent Emporia

Nova C Double Back Ondular

Article number: NBADC4
Details
Ascent Emporia

Nova C Double Back Bracket

Article number: NBADC2
Details
Ascent Emporia

Nova C Double Back Omega

Article number: NBADC3
Details
Ascent Emporia

Nova C Crossroad 4 Small

Article number: NBXC4
Details
Ascent Emporia

Nova C Crossroad 3 Small

Article number: NBXC3
Details
Ascent Emporia

Nova C Crossroad 3 Large

Article number: NBXC1
Details

Modules

Ascent Emporia

Nova C Planter Straight

Article number: A01B_6
Details
Ascent Emporia

Nova C Planter Curved

Article number: A01B_7
Details
Ascent Emporia

Nova C Planter Square

Article number: A01B_5
Details
Ascent Emporia

Nova C Planter Slice

Article number: A01B_8
Details

Modules

Ascent Emporia

Nova C Back 100

Article number: NBA1
Details
Ascent Emporia

Nova C Back 150

Article number: NBA5
Details
Ascent Emporia

Nova C Back Convex 30°

Article number: NBA3_30
Details
Ascent Emporia

Nova C Back Convex 45°

Article number: NBA3_45
Details
Ascent Emporia

Nova C Back Convex 90°

Article number: NBA3_90
Details
Ascent Emporia

Nova C Back Concave 30°

Article number: NBA4_30
Details
Ascent Emporia

Nova C Back Concave 45°

Article number: NBA4_45
Details
Ascent Emporia

Nova C Back Concave 60°

Article number: NBA4_60
Details
Ascent Emporia

Nova C Back Concave 90°

Article number: NBA4_90
Details
Ascent Emporia

Nova C Back S-Curve L

Article number: NBA6_L
Details
Ascent Emporia

Nova C Back S-Curve R

Article number: NBA6_R
Details
Ascent Emporia

Nova C Back Endpiece L

Article number: NBA7_L
Details
Ascent Emporia

Nova C Back Endpiece R

Article number: NBA7_R
Details
Ascent Emporia

Nova C Back Endpiece Corner

Article number: NBA8
Details

Add-ons

Ascent Emporia

Nova C Wireless Table

Article number: NBX_TW
Details
Ascent Emporia

Nova C Back Armrest

Article number: NBA_A
Details
Ascent Emporia

Nova C Food & Beverage Armrest

Article number: NBA_A2
Details
Ascent Emporia

Nova C Table

Article number: NBX_T
Details
Ascent Emporia

Nova C Stone Table Top Eter

Article number: BA00321
Details
Ascent Emporia

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details
Ascent Emporia

Nova C Food & Beverage Armrest w/Charger

Article number: NBA_A3
Details
Ascent Emporia

Nova C Logo on Rib

Article number: NBA_RL
Details
Ascent Emporia

Nova C Leg Charger

Article number: A01D_x
Details
Ascent Emporia

Nova C Rib Charger

Article number: NBA_RC
Details
Ascent Emporia

Nova C Divider

Article number: A01E_3
Details
Ascent Emporia

Nova C Divider Concave

Article number: A01E_2
Details
Ascent Emporia

Nova C Divider Convex

Article number: A01E_1
Details
Ascent Emporia

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details
Ascent Emporia

Nova C Accessibility Signage Older

Article number: BA00095
Details

Configurations

Ascent Emporia

Nova C Back Straight

Article number: NBAC6
Details
Ascent Emporia

Nova C Back Donut

Article number: NBAC5
Details
Ascent Emporia

Nova C Back Circle

Article number: NBAC1
Details
Ascent Emporia

Nova C Back Bracket Convex

Article number:
Details
Ascent Emporia

Nova C Back Bracket Concave

Article number: NBAC2
Details
Ascent Emporia

Nova C Back Omega

Article number: NBAC3
Details
Ascent Emporia

Nova C Back Wiggly

Article number: NBAC7
Details
Ascent Emporia

Nova C Back Tilde

Article number: NBAC9
Details
Ascent Emporia

Nova C Back Ondular

Article number: NBAC8
Details
Ascent Emporia

Nova C Back Infinity

Article number: NBAC4
Details
Ascent Emporia

Nova C Back Stadium

Article number: NBAC10
Details
Ascent Emporia

Nova C Bowtie

Article number: NBAC11
Details
Ascent Emporia

Nova C Crossroad 3 Small

Article number: NBXC3
Details
Ascent Emporia

Nova C Crossroad 4 Small

Article number: NBXC4
Details
Ascent Emporia

Nova C Crossroad 3 Large

Article number: NBXC1
Details
Ascent Emporia

Nova C Fidget Small

Article number: NBXC6
Details
Ascent Emporia

Nova C Fidget

Article number: NBXC5
Details
Ascent Emporia

Nova C Droplet

Article number: NBAC12
Details
Ascent Emporia

Nova C T-Connection

Article number:
Details

Green Airport Spaces

Whether working with a blank canvas or retrofitting a terminal, we will help you bring a comfortable experience from check-in to gate. Taking passenger satisfaction as our starting point, we create places that make the travel experience easy to enjoy.

Discover more airport design
Planning tool and layout planner

Let us design your next airport project

Our in-house designers will help you with a free 3D floor-plan rendering.