Rutgers School of Dental Medicine

Placemaking design at Rutgers School of Dental Medicine
  • Customer Rutgers University
  • Architect Green Furniture Concept
  • Year 2018
This is biophilic design in action. With our sculptural furnishings, we brough the outside in, transforming this cement atrium into a warm and inviting indoor park - the ideal place to foster a sense of college community.
Sandra Afeyan, Director of Sales and Marketing at Green Furniture Concept - Americas

Rutgers School of Dental Medicine is New Jersey’s only dental school that offers education, patient care, research and service. That means their building is home to many different kinds of visitors – students, faculty, staff patients and clinical researchers alike. At the heart of their building is a large-two story atrium, which is designed to feel like a central park for their entire community.

60

trees planted thanks to this project

Products in this project

Modules

Nova C Back 100

Article number: NBA1
Details

Nova C Back 150

Article number: NBA5
Details

Nova C Back Convex 30°

Article number: NBA3_30
Details

Nova C Back Convex 45°

Article number: NBA3_45
Details

Nova C Back Convex 90°

Article number: NBA3_90
Details

Nova C Back Concave 30°

Article number: NBA4_30
Details

Nova C Back Concave 45°

Article number: NBA4_45
Details

Nova C Back Concave 90°

Article number: NBA4_90
Details

Nova C Back S-Curve L

Article number: NBA6_L
Details

Nova C Back S-Curve R

Article number: NBA6_R
Details

Nova C Back Endpiece L

Article number: NBA7_L
Details

Nova C Back Endpiece R

Article number: NBA7_R
Details

Nova C Back Endpiece Corner

Article number: NBA8
Details

Add-ons

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C F&B Armrest

Article number: NBA_A2
Details

Nova C Table

Article number: NCAB-XX
Details

Nova C F&B Armrest w/Charger

Article number: NBA_A3
Details

Nova C Logo on Rib

Article number: NBA_RL
Details

Nova C Leg Charger

Article number: A01D_x
Details

Configurations

Nova C Back Straight

Article number: NBAC7
Details

Nova C Back Donut

Article number: NBAC5
Details

Nova C Back Circle

Article number: NBAC1
Details

Nova C Back Bracket Convex

Article number: NBAC3
Details

Nova C Back Bracket Concave

Article number: NBAC2
Details

Nova C Back Omega

Article number: NBAC4
Details

Nova C Back Wiggly

Article number: NBAC8
Details

Nova C Back Tilde

Article number: NBAC10
Details

Nova C Back Ondular

Article number: NBAC9
Details

Nova C Back Infinity

Article number: NBAC5
Details

Nova C Back Stadium

Article number: NBAC11
Details

Nova C Bowtie

Article number: NBAC12
Details

Nova C Crossroad 3 Small

Article number: NBXC3
Details

Nova C Crossroad 4 Small

Article number: NBXC4
Details

Nova C Crossroad 3 Large

Article number: NBXC6
Details

Nova C Fidget Small

Article number: NBXC6
Details

Nova C Fidget

Article number: NBXC5
Details

Nova C Eye

Article number: NBAC13
Details

Nova C Droplet

Article number: NBAC13
Details

Nova C T-Connection

Article number:
Details

Modules

Nova C Double Back 100

Article number: NBAD1
Details

Nova C Double Back 150

Article number: NBED5
Details

Nova C Double Back 30°

Article number: NBAD2_30
Details

Nova C Double Back 45°

Article number: NBAD2_45
Details

Nova C Double Back Endpiece

Article number: NBAD7
Details

Add-ons

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C Table

Article number: NCAB-XX
Details

Nova C F&B Armrest

Article number: NBA_A2
Details

Nova C F&B Armrest w/Charger

Article number: NBA_A3
Details

Nova C Leg Charger

Article number: A01D_x
Details

Nova C Logo on Rib

Article number: NBA_RL
Details

Nova C Double Back Endpiece Cover w/Charger

Article number: NBAD_ECC
Details

Nova C Double B2B Cover

Article number: NBAD_EC2
Details

Configurations

Nova C Double Back Straight

Article number: NBADC1
Details

Nova C Double Back Wiggly

Article number: NBACD6
Details

Nova C Double Back Tilde

Article number: NBADC5
Details

Nova C Double Back Ondular

Article number: NBACD4
Details

Nova C Double Back Bracket

Article number: NBEC2
Details

Nova C Double Back Omega

Article number: NBADC3
Details

Nova C Crossroad 4 Small

Article number: NBXC4
Details

Nova C Crossroad 3 Small

Article number: NBXC3
Details

Nova C Crossroad 3 Large

Article number: NBXC6
Details

Modules

Leaf Lamp Tree S

Article number: LLT130
Details

Leaf Lamp Tree M

Article number: LLT230
Details

Leaf Lamp Tree L

Article number: LLT300
Details

Add-ons

Leaf Lamp Link Tree Baseplate

Article number: LLT01
Details

Modules

Planter Straight

Article number: A01B_6
Details

Planter Curved

Article number: A01B_7
Details

Planter Square

Article number: A01B_5
Details

Planter Slice

Article number: A01B_8
Details

Modules

Recycle Bin Lid Compost

Article number: A01A_7
Details

Recycle Bin Lid Glass

Article number: Article number: A01A-2
Details

Recycle Bin Lid Metal

Article number: A01A_8
Details

Recycle Bin Lid Paper

Article number: A01A-3
Details

Recycle Bin Lid Plastic

Article number: A01A_9
Details

Recycle Bin Lid Recyle

Article number: A01A_10
Details

Recycle Bin Lid Waste

Article number: A01A_6
Details

Add-ons

Recycle Bin Custom Lid

Article number: A01A-5
Details

Recycle Bin Custom Cut Out

Article number: A01A_X3
Details

Configurations

Recycle BIn Set of 3

Radius Recycle Bin Set of 3

Article number: A01A-1
Details

Green educational spaces

Our approach creates the right kind of learning environment, making it easier for students to learn, share knowledge and ideas. We’re passionate about healthy school environments. That’s why we choose natural materials that have a positive impact on well-being and create places that benefit students and educators. Our seating is durable and easy to maintain, while our surface designs provide places to prepare for lessons and recharge devices.

Discover more educational space design
Planning tool and layout planner

Let us design your next education project

Our in-house designers will help you with a free 3D floor-plan rendering.