Designing healthcare spaces

Places inspired by nature have the power to nurture and soothe, bringing a sense of wellbeing to clinical environments. Natural materials and indoor planters generate a sense of wellbeing among patients and caregivers. Our designs bring them to clinical environments to make places that honour wellness and add holistic elements to healthcare. Our seamless seating designs are made of wood and treated with wax, naturally, antibacterial material that can withstand the surface disinfectants used in clinical environments. The seamless seating designs designate required distances between individuals while enabling families and caregivers to remain together.

52

Green healthcare projects

modular bench for healthcare spaces

Inclusive Design

Green's seating is accessible and inclusive, making it easy for a wider diversity of people to use it.
We offer special elevated seats and accessibility adapted modules and add-ons.

seamless bench in hospital area

Wood is antiseptic

Furniture is a vital aspect of placemaking and can create architectural impact while being attuned to the individual story of a place. It can be unique, surprising and memorable and help to enhance local character. Placemaking furniture creates connections and improves visitor satisfaction. It suggests the use of space and place-specific ways of living, and it invites personal experience.

Planning tool and layout planner

Let us design your next healthcare project

Our in-house designers will help you with a free 3D floor-plan rendering.

modular furniture waiting area healthcare malmö hospital

Marita Olsson, infection control nurse, Region Skåne

“Compared to furniture upholstered in artificial leather, which cracks and tears, hospital hygiene has improved. The benches are easy to clean. We have also noticed that nothing gets missed when the floors are washed, which shows that the benches can be separated and moved for cleaning in a way that meets our standards. The patients are also kept apart from each other a little, in that there is a set distance back-to-back. I am impressed!”

Design Tips

Biophilic design in healthcare enhances patient wellbeing

Lately, studies and research have shown the influence of the environment on the wellbeing of patients and staff in the health sector. Some of the results have shown the importance of thought through design and its effect on wellness and healing.

At Green, our placemaking design brings nature inside, so-called biophilic design. Using materials, colours, patterns, and shapes inspired by nature, creating a toolbox for designers to use in their work to make our healthcare facilities matter, a home away from home.

Read more about how to create patient wellbeing through biophilic design in healthcare
Gina Fagone

Get in touch with us!

Don’t know where to start with your healthcare project? Schedule a meeting with us, and we’ll help you get started. Our team has years of experience in placemaking design, achieving enhanced patient wellbeing in healthcare spaces.

Products for healthcare spaces

Modules

Ascent Double Rise

Article number: BA00005
Details

Ascent Double Rise L 60º

Article number: BA00010
Details

Ascent Double Rise R 60º

Article number: BA00009
Details

Ascent Double Bench Endpiece

Article number: BA00013
Details

Ascent Double Back Endpiece

Article number: BA00019
Details

Add-ons

Ascent Armrest

Article number: BA00014
Details

Ascent Accessible Armrest

Article number: BA00043
Details

Ascent Elevated Accessible Armrest

Article number: BA00044
Details

Ascent Elevated Accessible End Armrest

Article number: BA00045
Details

Ascent Table

Article number: BA00015
Details

Ascent Elevated Table

Article number: BA00042
Details

Ascent Charger

Article number: BA00020
Details

Ascent Endpiece Charger

Article number: BA00056
Details

Ascent Elevated Seat

Article number: BA00048
Details

Ascent Seat Cushion

Article number: BP00099
Details

Ascent Double Planter Straight

Article number: BA00189
Details

Configurations

Ascent Straight

Article number: BA00050
Details

Ascent Bracket

Article number: BA00051
Details

Ascent Omega

Article number: BA00052
Details
Ascent Wiggly bench

Ascent Wiggly

Article number: BA00053
Details
Ascent Tilde

Ascent Tilde

Article number: BA00054
Details
seamless crossroad bench

Ascent Crossroad

Article number: BA00055
Details

Modules

Ascent Double Back 200

Article number: BA00003
Details

Ascent Double Back 60º

Article number: BA00007
Details

Ascent Double Back Endpiece

Article number: BA00019
Details

Add-ons

Ascent Armrest

Article number: BA00014
Details

Ascent Accessible Armrest

Article number: BA00043
Details

Ascent Elevated Accessible Armrest

Article number: BA00044
Details

Ascent Elevated Accessible End Armrest

Article number: BA00045
Details

Ascent Table

Article number: BA00015
Details

Ascent Elevated Table

Article number: BA00042
Details

Ascent Charger

Article number: BA00020
Details

Ascent Endpiece Charger

Article number: BA00056
Details

Ascent Elevated Seat

Article number: BA00048
Details

Ascent Seat Cushion

Article number: BP00099
Details

Ascent Double Planter Straight

Article number: BA00189
Details

Configurations

Ascent Bracket

Article number: BA00051
Details

Ascent Omega

Article number: BA00052
Details

Modules

Ascent Back 200

Article number: BA00006
Details

Ascent Back Convex 60°

Article number: BA00011
Details

Ascent Back Concave 60°

Article number: BA00012
Details

Ascent Back Endpiece L

Article number: BA00018
Details

Ascent Back Endpiece R

Article number: BA00017
Details

Add-ons

Ascent Armrest

Article number: BA00014
Details

Ascent Accessible Armrest

Article number: BA00043
Details

Ascent Elevated Accessible Armrest

Article number: BA00044
Details

Ascent Elevated Accessible End Armrest

Article number: BA00045
Details

Ascent Table

Article number: BA00015
Details

Ascent Elevated Table

Article number: BA00042
Details

Ascent Charger

Article number: BA00020
Details

Ascent Endpiece Charger

Article number: BA00056
Details

Ascent Elevated Seat

Article number: BA00048
Details

Ascent Seat Cushion

Article number: BP00099
Details

Ascent Accessible Signage Pregnant

Article number: BA00047
Details

Ascent Accessible Signage Older

Article number: BA00046
Details

Ascent Double Planter Straight

Article number: BA00189
Details

Configurations

seamless crossroad bench

Ascent Crossroad

Article number: BA00055
Details

Modules

Ascent Double Bench 200

Article number: BA00004
Details

Ascent Double Bench 60º

Article number: BA00008
Details

Ascent Double Bench Endpiece

Article number: BA00013
Details

Add-ons

Ascent Armrest

Article number: BA00014
Details

Ascent Table

Article number: BA00015
Details

Ascent Charger

Article number: BA00020
Details

Ascent Endpiece Charger

Article number: BA00056
Details

Ascent Double Planter Straight

Article number: BA00189
Details

Modules

Nova C Back 100

Article number: NBA1
Details

Nova C Back 150

Article number: NBA5
Details

Nova C Back Convex 30°

Article number: NBA3_30
Details

Nova C Back Convex 45°

Article number: NBA3_45
Details

Nova C Back Convex 90°

Article number: NBA3_90
Details

Nova C Back Concave 30°

Article number: NBA4_30
Details

Nova C Back Concave 45°

Article number: NBA4_45
Details

Nova C Back Concave 90°

Article number: NBA4_90
Details

Nova C Back S-Curve L

Article number: NBA6_L
Details

Nova C Back S-Curve R

Article number: NBA6_R
Details

Nova C Back Endpiece L

Article number: NBA7_L
Details

Nova C Back Endpiece R

Article number: NBA7_R
Details

Nova C Back Endpiece Corner

Article number: NBA8
Details

Add-ons

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C Food and Beverage Armrest

Article number: NBA_A2
Details

Nova C Table

Article number: NBX_T
Details

Nova C Food and Beverage Armrest w/Charger

Article number: NBA_A3
Details

Nova C Leg Charger

Article number: A01D_x
Details

Nova C Accessibility Signage Older

Article number: BA00095
Details

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details

Configurations

Nova C Back Straight

Article number: NBAC6
Details

Nova C Back Donut

Article number: NBAC5
Details

Nova C Back Circle

Article number: NBAC1
Details

Nova C Back Bracket Convex

Article number: NBAC14
Details

Nova C Back Bracket Concave

Article number: NBAC2
Details

Nova C Back Omega

Article number: NBAC3
Details

Nova C Back Wiggly

Article number: NBAC7
Details

Nova C Back Tilde

Article number: NBAC9
Details

Nova C Back Ondular

Article number: NBAC8
Details

Nova C Back Infinity

Article number: NBAC4
Details

Nova C Back Stadium

Article number: NBAC10
Details

Nova C Bowtie

Article number: NBAC11
Details

Nova C Crossroad 3 Small

Article number: NBXC3
Details

Nova C Crossroads 4 Medium

Article number: NBXC4
Details

Nova C Crossroad 3 Medium

Article number: NBXC1
Details

Nova C Fidget Small

Article number: NBXC6
Details

Nova C Fidget

Article number: NBXC5
Details

Nova C Eye

Article number: NBAC13
Details

Nova C Droplet

Article number: NBAC12
Details

Modules

Nova C Back Elevation

Article number: NBAE1
Details

Nova C Back Elevation Concave 30°

Article number: NBAE4_30
Details

Nova C Back Elevation Concave 45°

Article number: NBAE4_45
Details

Nova C Back Elevation Concave 90°

Article number: NBAE4_90
Details

Nova C Back Elevation Convex 30°

Article number: NBAE3_30
Details

Nova C Back Elevation Convex 45°

Article number: NBAE3_45
Details

Nova C Back Elevation Convex 90°

Article number: NBAE3_90
Details

Nova C Back Elevation Step L

Article number: NBAE1_L
Details

Nova C Back Elevation Step R

Article number: NBAE1_R
Details

Nova C Back Elevation Endpiece L

Article number: NBAE7_L
Details

Nova C Back Elevation Endpiece R

Article number: NBAE7_R
Details

Nova C Back Elevation S-curve Left

Article number: NBAE6_L
Details

Nova C Back Elevation S-curve Right

Article number: NBAE6_R
Details

Add-ons

Nova C Food and Beverage Armrest w/Charger

Article number: NBA_A3
Details

Nova C Food and Beverage Armrest

Article number: NBA_A2
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C Table

Article number: NBX_T
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Leg Charger

Article number: A01D_x
Details

Nova C Accessibility Signage Older

Article number: BA00095
Details

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details

Modules

Nova C Double Back 100

Article number: NBAD1
Details

Nova C Double Back 150

Article number: NBED5
Details

Nova C Double Back 30°

Article number: NBAD2_30
Details

Nova C Double Back 45°

Article number: NBAD2_45
Details

Nova C Double Back Endpiece

Article number: NBAD7
Details

Add-ons

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C Table

Article number: NBX_T
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Food and Beverage Armrest

Article number: NBA_A2
Details

Nova C Food and Beverage Armrest w/Charger

Article number: NBA_A3
Details

Nova C Leg Charger

Article number: A01D_x
Details

Nova C Double Back Endpiece Cover w/Charger

Article number: NBAD_ECC
Details

Nova C Double B2B Cover

Article number: NBAD_EC2
Details

Nova C Accessibility Signage Older

Article number: BA00095
Details

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details

Configurations

Nova C Double Back Straight

Article number: NBADC1
Details

Nova C Double Back Wiggly

Article number: NBADC6
Details

Nova C Double Back Tilde

Article number: NBADC5
Details

Nova C Double Back Ondular

Article number: NBADC4
Details

Nova C Double Back Bracket

Article number: NBADC2
Details

Nova C Double Back Omega

Article number: NBADC3
Details

Nova C Crossroads 4 Medium

Article number: NBXC4
Details

Nova C Crossroad 3 Small

Article number: NBXC3
Details

Nova C Crossroad 3 Medium

Article number: NBXC1
Details

Modules

Nova C Double Back Elevation

Article number: NBADEE1
Details

Nova C Double Back Elevation 30°

Article number: NBADEE2_30
Details

Nova C Double Back Elevation 45°

Article number: NBADEE2_45
Details

Nova C Double Back Elevation Endpiece

Article number: NBADEE7
Details

Add-ons

Nova C Food and Beverage Armrest w/Charger

Article number: NBA_A3
Details

Nova C Food and Beverage Armrest

Article number: NBA_A2
Details

Nova C Back Armrest

Article number: NBA_A
Details

Nova C Table

Article number: NBX_T
Details

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Leg Charger

Article number: A01D_x
Details

Nova C Accessibility Signage Older

Article number: BA00095
Details

Nova C Accessibility Signage Pregnant

Article number: BA00096
Details

Modules

Nova C Bench 100

Article number: NBE1
Details

Nova C Bench 150

Article number: NBE5
Details

Nova C Bench 30°

Article number: NBE2_30
Details

Nova C Bench 45°

Article number: NBE2_45
Details

Nova C Bench 90°

Article number: NBE2_90
Details

Add-ons

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Bench Armrest

Article number: NBE_A
Details

Nova C Table

Article number: NBX_T
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Leg Charger

Article number: A01D_x
Details

Configurations

Nova C Bench Straight

Article number: NBEC8
Details

Nova C Bench Wiggly

Article number: NBEC6
Details

Nova C Bench Ondular

Article number: NBEC9
Details

Nova C Bench Tilde

Article number: NBEC5
Details

Nova C Bench Bracket

Article number: NBEC2
Details

Nova C Bench Donut

Article number: NBEC7
Details

Nova C Bench Circle

Article number: NBEC1
Details

Nova C Bench Omega

Article number: NBEC3
Details

Nova C Bench Stadium

Article number: NBEC10
Details

Nova C Bench Infinity

Article number: NBEC4
Details

Modules

Nova C Double Bench 100

Article number: NBED1
Details

Nova C Double Bench 150

Article number: NBED5
Details

Nova C Double Bench 30°

Article number: NBED2_30
Details

Nova C Double Bench 45°

Article number: NBED2_45
Details

Nova C Double Bench Endpiece

Article number: NBED7
Details

Add-ons

Nova C Table

Article number: NBX_T
Details

Nova C Stone Table Top Eter

Article number: BA00321
Details

Nova C Stone Table Top Lunar 22

Article number: BA00322
Details

Nova C Wireless Table

Article number: NBX_TW
Details

Nova C Double Bench Armrest

Article number: NBED_A
Details

Nova C Leg Charger

Article number: A01D_x
Details

Modules

Nova C Lounge

Article number: NRE1
Details

Nova C Lounge Concave 30°

Article number: NRE4
Details

Nova C Lounge Convex 30°

Article number: NRE3
Details

Add-ons

Nova C Lounge Table

Article number: NRE_TC
Details

Nova C Leg Charger

Article number: A01D_x
Details

Modules

Nova C Double Lounge

Article number: NRED1
Details

Nova C Double Lounge 15°

Article number: NRED2
Details

Add-ons

Nova C Lounge Table

Article number: NRE_TC
Details

Nova C Leg Charger

Article number: A01D_x
Details

Modules

Nova C Kids Body 30°

Article number: NBEK2
Details

Nova C Kids Head 30°

Article number: NBEK1
Details

Modules

Leaf Lamp Tree S

Article number: LLT130
Details

Leaf Lamp Tree M

Article number: LLT230
Details

Leaf Lamp Tree L

Article number: LLT300
Details

Add-ons

Leaf Lamp Baseplate Extension M/L

Article number: LLT01
Details

Modules

Leaf Lamp Pendant

Article number: LLP130
Details

Modules

Nova C Divider 100

Article number: A01E_3
Details

Nova C Divider Convex 45°

Article number: A01E_1
Details

Nova C Divider Concave 45°

Article number: A01E_2
Details

Add-ons

Nova C Divider Custom Cut Out

Article number: A01E_X3
Details

Modules

Nova C Planter Straight

Article number: A01B_6
Details

Nova C Planter Curved

Article number: A01B_7
Details

Nova C Planter Square

Article number: A01B_5
Details

Nova C Planter Slice

Article number: A01B_8
Details

Modules

Planter Divider Straight

Article number: A01B_3
Details

Planter Divider Concave

Article number: A01B_2
Details

Planter Divider Convex

Article number: BA00207
Details

Planter Divider Donut

Article number: A01B_12
Details

Planter Divider Circle

Article number: A01B_15
Details

Planter Divider Corner

Article number: A01B_10
Details

Planter Divider Crossroad 3 Small

Article number: A01B_14
Details

Planter Divider Crossroad 4 Small

Article number: A01B_13
Details

Planter Divider Droplet

Article number: A01B_11
Details

Planter Divider Half Eye

Article number: A01B_17
Details

Planter Divider Eye

Article number: A01B_16
Details

Planter Divider T-Connection

Article number: A01B_18
Details

Planter Divider Wide Straight

Article number: A01B_20
Details

Planter Divider Half Donut

Article number: A01B_19
Details

Planter Divider Crossroads 3 Large

Article number: A01B_21
Details

Nova C Planter Divider Convex 45°

Article number: BA00207
Details

Nova C Planter Divider Infinity Fill

Article number: BA00204
Details

Nova C Planter Divider Straight 150

Article number: BA00195
Details

Modules

Recycle Bin Lid Compost

Article number: A01A_7
Details

Recycle Bin Lid Glass

Article number: A01A_2
Details

Recycle Bin Lid Metal

Article number: A01A_8
Details

Recycle Bin Lid Paper

Article number: A01A_3
Details

Recycle Bin Lid Plastic

Article number: A01A_9
Details

Recycle Bin Lid Recyle

Article number: A01A_10
Details

Recycle Bin Lid Waste

Article number: A01A_6
Details

Add-ons

Recycle Bin Custom Lid

Article number: A01A_5
Details

Configurations

Recycle BIn Set of 3

Radius Recycle Bin Set of 3

Article number: A01A_1
Details